Changing Ivy Road / 250 Corridor Survey

This survey (Virginia and Albemarle are great at surveys and studies!) is not specific to Crozet, but most of us use 250 and Ivy Road on a near-daily basis.

Takeway, if you read nothing else:

The survey, which has a translation tool for other languages, is available (here) Comments can also be sent by email to [email protected] or by postal mail to Michael Barnes, Virginia Department of Transportation, 1601 Orange Road, Culpeper, VA, 22701.

Background from Charlottesville Community Engagement:


Via email: (boldings beyond the first two lines are mine)

PROVIDE INPUT ON U.S. 250 IN ALBEMARLE, CHARLOTTESVILLE

Study is first step to identify possible transportation improvements on Ivy Road corridor

CULPEPER — The Virginia Department of Transportation is seeking feedback on a transportation study assessing potential safety and multimodal improvements for the U.S. 250 (Ivy Road) corridor, including the interchange with U.S. 29, between Ednam Drive within Albemarle County and Alderman Road within the City of Charlottesville.

The purpose of this study is to identify project recommendations for the U.S. 250 corridor. This study will focus on improving roadway safety, reducing traffic congestion, improving access, and enhancing multimodal accessibility and connectivity for pedestrians, bicyclists, and transit users, including how these needs might be satisfied by facilities within the Route 601 (Old Ivy Road) corridor.

The study will build off previous study efforts for the study area led by VDOT and the localities and provide multiple opportunities for public input. The project recommendations that come from this study will be developed into funding applications for SMART SCALE Round 6 and other transportation funding programs.

VDOT invites residents and travelers to learn more and take an online survey through Aug. 18. Community input received through this survey will help the study team identify existing issues along the study corridor and develop recommendations for potential improvements that will be evaluated and presented during the next phase of the study, which will include another opportunity for public comment.

The survey, which has a translation tool for other languages, is available at https://vaprojectpipeline.org/studies/culpeper/cu-23-09.asp. Comments can also be sent by email to [email protected] or by postal mail to Michael Barnes, Virginia Department of Transportation, 1601 Orange Road, Culpeper, VA, 22701.

This study is being conducted as part of the Project Pipeline program, which was created by the Commonwealth Transportation Board. Project Pipeline is a performance-based planning program to identify cost-effective solutions to multimodal transportation needs in Virginia. Project Pipeline is led by Virginia’s Office of Intermodal Planning and Investment, in collaboration with VDOT and the Department of Rail and Public Transportation.

The Commonwealth is partnering with Albemarle County, the City of Charlottesville, the University of Virginia, the Thomas Jefferson Planning District Commission, and RK&K to develop targeted improvements for the U.S. 250 (Ivy Road) Project Pipeline Study that minimize community impacts and address priority needs in a cost-effective way. This study is expected to be complete in summer 2024; it does not set construction dates for any improvements. The final plan will provide a multimodal investment strategy that can be used to seek and secure funding through programs including SMART SCALE, revenue sharing, interstate funding, and others.

VDOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact VDOT’s Culpeper District Office of Civil Rights at (540) 829-7391.

Updates on Culpeper District activities are on the district’s Facebook page and the district’s Twitter account, @VaDOTCulp. For questions or to report hazardous road conditions, the public should contact VDOT’s 24-hour Customer Service Center by visiting my.vdot.virginia.gov or calling 800-FOR-ROAD (367-7623). 

Current traffic conditions, VDOT’s statewide network of traffic cameras and other real-time travel information is on the 511Virginia website. That information is also available on the free VDOT 511 mobile app or by calling 511 from any phone in Virginia.


Try as I might, a dark beer works better for this photo … sadly, I didn’t have a dark beer available when I was writing this story.

Print Friendly, PDF & Email

Something to say?